선보공업

본문 바로가기
  • PRODUCED WATER TREATMENT PACKAGE

    • Project : SHWE PLATFORM PROJECT
    • Site : Myanmar
    • Client : GPS
    • EPCI : HHI
    • End-user : DEAWOO INTERNATIONAL
    • Delivery : October .2011
    • Scope of Work : Shop/Field Fabrication Drawings
        Procurement of piping and
        structural steel works material
        Fabrication of piping, structural work / SKID
        assembly with E&I Interconnection
        Final Vendor Documents
    • Main Material : Structure : S355J0, A36
        Piping : GRE, SS316, CS
  • SRU/UF PACKAGE

    • Project : CLOV FPSO Project
    • Site : Angola
    • Client : VWS WESTGARTH
    • EPCI : DSME
    • End-user : TOTAL
    • Delivery : April. 2013
    • Size : 20m(W)x20m(L)x8m(H) x 2 sets
    • Weight : Approx. 900 Ton
    • Scope of Work : Shop/Field Fabrication Drawings
        Fabrication of piping, structural work
        and unit assembly
        Final Vendor Documents
    • Main Material : Structure : S355J2 KL-20 / KT-40, K2
        Piping : SSDS, GRE, SS316, CS
  • ELECTROCHLORINATION PACKAGE

    • Project : CLOV FPSO Project
    • Site : Angola
    • Client : SESPI ITA
    • EPCI : DSME
    • End-user : TOTAL
    • Delivery : May. 2013
    • Size : 10m(W)x4m(L)x4m(H) x 1 sets
    • Weight : 25 Ton
    • Scope of Work : Shop/Field Fabrication Drawings
        Fabrication of piping, structural work
        and unit assembly
        Final Vendor Documents
        3D Modeling
    • Main Material : Structure : S355J2 KL-20 / KT-40, K2
        Piping : SS316, PVDF
  • DEOXYGENATION PACKAGE

    • Project : CLOV FPSO Project
    • Site : Angola
    • Client : Agility Group MINOX AS TECHNOLOGY
    • EPCI : DSME
    • End-user : TOTAL
    • Delivery : May .2013
    • Size : 15m(W)x10m(L)x10m(H) x 1 sets
    • Weight : 180 Ton
    • Scope of Work : Shop/Field Fabrication Drawings
        Fabrication of piping, structural work
        and unit assembly
        Final Vendor Documents
    • Main Material : Structure : S355J2 KL-20 / KT-40, K2
        Piping : GRE, SS316L, Alloy, CS
  • ACTIVATED CARBON POLISHING UNIT,
    MIXED BEDS EXCHANGER POLISHER PACKAGE

    • Project : SHELL FLNG Project
    • Site : W.AUSTRALIA
    • Shipyard : Samsung Heavy Industries
    • Engineering : BONO ARTES in Italy
    • End-user : SHELL
    • Delivery : 4Q. 2013(ACP) / 1Q. 2014(MBP)
    • Size : ACP : 14M X 4.5M X 8.9M
        MBP : 15M X 4.7M X 8.6M
    • Weight : 86 / 95 Ton
    • Scope of Work : Shop/Field Fabrication Drawings
        Procurement of bulk materilas
        Fabrication of piping, stru. And unit assembly
        Final Document
    • Main Material : Structure : S275JR
        Piping : SS316 L, CS with PTFE Lining
  • CALORIFIER PACKAGE

    • Project : Ichthys CPF and FPSO Project
    • Site : Australia
    • Shipyard : SHI / DSME
    • Engineering : SUNBO
    • End-user : INPEX
    • Delivery : 4Q. 2014(CPF) / 2Q. 2014(FPSO)
    • Size : 6m(W)x5m(L)x4m(H)1set and other 1set
    • Weight : 10.7 / 6.2 Ton
    • Scope of Work : Basic/Detail/Shop/Field Fabrication Drawings
        Procurement all of materials and Electric heater
        Fabrication of Equip, piping, stru.
         and unit assembly
        Final Vendor Documents
        3D Modeling and Others
    • Main Material : Structure : 355J2
        Piping : Duplex, SS316L
        Equipment : 316L
    • Remark : EEHA Installer is available
  • MEG REGENERATION SKID

    • Project : Takula Platform Project
    • Site : Angola
    • Client : Natco Japan(Cameron)
    • EPCI : Samsung Heavy Industries Co., Ltd
    • End-user : Chevron
    • Delivery : August. 2007
    • Size : 4.5m(W)x8.5m(L)x4m(H)
    • Weight : 100 Ton
    • Scope of Work : Shop/Field Fabrication Drawings
        Procurement of piping and structural material
        Fabrication of piping, structural work
        and SKID assembly with E&I Interconnection
        Final Vendor Documents
  • GAS SWEETING SKID

    • Project : Takula Platform Project
    • Site : Angola
    • Client : Natco Japan(Cameron)
    • EPCI : Samsung Heavy Industries Co., Ltd
    • End-user : Chevron
    • Delivery : August. 2007
    • Size : 8.5m(W)x16.5 m(L)x7m(H)
    • Weight : 200 Ton
    • Scope of Work : Shop/Field Fabrication Drawings
        Procurement of piping and structural material
        Fabrication of piping, structural work
        and SKID assembly with E&I Interconnection
        Final Vendor Documents
  • FUEL GAS SKID

    • Project : Agbami FPSO Project
    • Site : Nigeria
    • Client : DSME
    • EPCI : DSME
    • End-user : Chevron
    • Delivery : October. 2007
    • Size : 4.5m(W)x8.5m(L)x4m(H)
    • Weight : 100 Ton
    • Scope of Work : Shop/Field Fabrication Drawings
        Procurement of piping and structural material
        Fabrication of piping, structural work and SKID assembly
        with E&I Interconnection
        Final Vendor Documents
  • PURIFIER SKID

    • Project : Agbami FPSO Project
    • Site : Nigeria
    • Client : DSME
    • EPCI : DSME
    • End-user : Chevron
    • Delivery : June. 2006
    • Scope of Work : Shop/Field Fabrication Drawings
        Procurement of piping and structural material
        Fabrication of piping, structural work / SKID
         assembly with E&I Interconnection
        assembly with E&I Interconnection