  • LPG Compressor Skid

    • Project : 84,000 M3 LPG Carrier
    • Client : PETREDEC / HHI
    • Dimension : 9.8m X 3.4m X 4.2m (L X B X H)
    • Weight : 37 Ton x 3sets
    • Brief Scope of Work
      Engineering Detail Eng. - LGE / Shop Eng. – SUNBO
      Material Compressor – WO&GS (Free issue), All Tagged Item – WO&GS (Free issue), S.S. Material - HHI (Free issue), Bulk Material except S.S. Material - SUNBO
      Fabrication SUNBO
      Assembly SUNBO
      Painting & Insulation SUNBO
      Others (WPS, NDE, TEST, FAT, Etc) SUNBO

      MAKER : SUNBO INDUSTRIES CO., LTD.DATE : 2015. 04. 16

      LPG COMPRESSOR SKID UNIT SALES REFERENCE LIST
      NO. HULL. NO. CONTRACT SHIP TYPE MAKER SHIP OWNER UNIT DELIVERY YARD CLASS
      1 1980 2007-11-05 22.5K LGE GEOGAS 3 2008-03-18 HHI BV
      2 1897 2007-11-14 35K LGE GEOGAS 3 2008-04-04 HHI LR
      3 1898 2007-11-14 35K LGE GEOGAS 3 2008-04-08 HHI LR
      4 2018 2008-12-24 82K HAMWORTHY CIDO 4 2009-06-04 HHI ABS
      5 2019 2008-12-24 82K HAMWORTHY CIDO 4 2009-08-21 HHI ABS
      6 2020 2008-12-24 82K HAMWORTHY CIDO 4 2009-10-27 HHI ABS
      7 1967 2009-02-04 35K LGE ORIX 3 2009-07-24 HHI LR
      8 2093 2009-05-06 22.5K HAMWORTHY NAFTOMAR 3 2009-09-15 HHI BV
      9 2094 2009-05-06 22.5K HAMWORTHY NAFTOMAR 3 2009-12-24 HHI BV
      10 2169 2009-05-06 22.5K HAMWORTHY NAFTOMAR 3 2010-01-05 HHI BV
      11 2360 2009-11-02 35K HAMWORTHY HYPROC 3 2010-04-07 HHI GL
      12 2361 2009-11-02 35K HAMWORTHY HYPROC 3 2010-05-20 HHI GL
      13 8118 2013-07-21 35K LGE JX 3 2014-02-18 HMD NK
      14 4020 2013-11-22 22.5K LGE ULTRAGAS 3 2014-08-30 STX LR
      15 4021 2013-11-22 22.5K LGE ULTRAGAS 3 2014-09-15 STX LR
      16 4024 2013-11-22 22.5K LGE ULTRAGAS 3 2014-10-15 STX LR
      17 4024 2013-11-22 22.5K LGE ULTRAGAS 3 2014-11-15 STX LR
      18 2753 2014-11-22 84K LGE PETREDEC 3 2015-11-30 HHI
  • LNG COMPRESSOR PACKAGE

    • Project : TEEKAY LNGC
    • Site : Republic of Korea
    • Shipyard : DSME
    • Engineering : BCAG
    • End-user : TEEKAY
    • Delivery : Apr. 2015
    • Size : 4.2m(H) x 13m(L) x 7m(W)
    • Weight : 160 Ton
    • Scope of Work : Procurement of bulk materials
        Fabrication of piping, stru. and rack assembly
        Punch Clear
    • Main Material : Structure - CS
        Piping - CS, SS316
  • LNG COMPRESSOR PACKAGE

    • Project : MOL FSRU
    • Site : Republic of Korea
    • Shipyard : DSME
    • Engineering : BCAG
    • End-user : MOL
    • Delivery : 15th of Sept. 2015
    • Size : 3.65m(H) x 11.6m(L) x 6.7m(W)
    • Weight : Expected 140 Ton
    • Scope of Work : Detail Engineering
        Procurement of bulk materials
        Fabrication of piping, stru. and rack assembly
        Final Document
    • Main Material : Structure - CS
        Piping - CS, SS316
  • LNG FUEL GAS SUPPLY SYSTEM

    • Project : 3,100TEU LNG Fuelled Container Ship
    • Shipyard : NASSCO, National Steel and Shipbuilding Company
    • Engineering : DSEC / Doosan Engine / Shinhan Machinery
    • End-user : TOTE(Totem Ocean Trailer Express)
    • Delivery : Jan. 2014
    • Size : 7.4m(W)x6.3m(L)x3m(H) x 1 sets
    • Weight : 35 Ton
    • Scope of Work : Detail/Shop/Field Fabrication Drawings
        Fabrication of piping, structural work
        and unit assembly
        Final Vendor Documents
        3D Modeling and Others
        Cryogenic Test using LN2
    • Main Material : Structure - CS
        Piping - CS, SS316
    • Remark : The World 1st FGSS for Shipbuilding
        Business Sector
  • LNG PARTIAL RE-LIQUEFACTION SYSTEM

    • Project : Test Pilot Project of DSME
    • Site : Republic of Korea
    • Shipyard : DSME
    • Engineering : DSME and SUNBO
    • End-user : DSME
    • Delivery : Apr. 2014
    • Size : 2.7m(H) x 3.5m(L) x 4.3m(W)
    • Weight : 5.5 Ton
    • Scope of Work : Shop/Field Fabrication Drawings
        Procurement of bulk materials
        Fabrication of piping, stru. And rack assembly
        Final Vendor Documents
        Cryogenic Test using LN2
    • Main Material : Structure - CS
        Piping - CS, SS316